Wayside – Phase 1

COMPLETED 2022

The Result

Obtained planning approval against a very challenging policy regime for the Wayside site, including its location in the restrictive Shoreline Zone. The original application was refused by the Planning Committee, but we put forward a strong case at appeal. This resulted in the Minister overturning the decision. This was on the strength of the Planning Inspector’s strong recommendation to allow the appeal because of the quality of the design and the various public benefits proposed.

The Project

Phase 1 – The existing Wayside Café was replaced with a new contemporary restaurant (The Beach Club), with a penthouse apartment above.